News


Permanent magnet synchronous wind power grid system and comprehensive training device
Release Time : 2024-04-26 View Count : 次
Permanent magnet synchronous wind power grid system and comprehensive tr--ning device,*r dynamics tr--ning device
I. Overview

Permanent magnet synchronous wind power grid system and comprehensive tr--ning device,*r dynamics tr--ning device
I. Overview
The platform consists of five parts: synchronous generator sets, unit control cabinets, transmission lines and monitoring protection screens, infinite power systems and impedance loads. Operation, testing and testing of teaching content such as automatic devices, monitoring, power system operation, relay protection and other teaching content commonly used during wind generation grid. The device adopts a fixed structure.
This tr--ning platform is suitable for tr--ning and experiments of related courses related courses related to universities, technical secondary schools, technical schools, electrical, and automation, and can also be used in the power industry for tr--ning in wind and electricity professionals.
2. Features
1. The automatic device is displayed in the 7 -inch color human machine interface, intuitive, clear
2. The automatic device combines the indicator light and button on the human machine interface.
3. The automatic device adopts software debugging and calibration, and the debugger can debug without disassembling the panel
4. The system running parameters can be set directly on the human machine interface, and the running status is displayed in real time
5. Have a complete personal protection function

Permanent magnet synchronous wind power grid system and comprehensive tr--ning device,*r dynamics tr--ning device
Technical Parameters:
1. Input power supply: three -phase AC380V ± 10% 50Hz, power 1.5kW.
2. Corresponding fan parameters: --r volume 2200 m3/h, wind pressure 1000 PA, power 1.5kW.
3. Local suction wind cover, transparent and organic glass material; experimental pipeline diameter φ160mm.
4. Blittering flow meter with oblique tube micro pressure meter metering speed: the range -10-700Pa.
5. 24 Tube oblique pipe pressure meter measuring cylindrical test parts and wing test parts of each point of each point of pressure distribution, 800mm in length, with a high shift ruler.
6. Experimental --r duct, 304 st--nless steel material in the entrance section and outlet section, the experimental section is made of transparent organic glass, and the experimental section can be switched and installed with various test parts. The flanges nut is connected to each other to facilitate disassembly.
7. Dimensions: 1700 × 500 × 1700mm. The shape is st--nless steel movement, with a double brake wheel.
8. Building building and smart building electrical installation virtual simulation software
Based on the UNITY3D design, users choose different interactive interface size based on the computer configuration. The software in the software can be rotated, magnified, reduced, and translated at 360 °. There are small assistant tips for software use, the content is as follows:
A. Wet alarm system
1. System summary: Overview of Wet Alarm System
2. Equipment cognition: there are ** perspectives, equipment det--ls (displayed or parameters of the device), practice (built -in 6 selection questions, there are prompts for correctness and errors), schematic diagrams (can be entered from the schematic diagram Go to the device). The equipment includes: nozzle, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, executive pressure gauge, high water tank, Weia control cabinet, stabilization tank, flow switch, end -end water testing device, dr--nage facility, water pump combinations, water pump combination Instruments, hydraulic bells, latencys, wet alarms, butterfly valves, stop valves, fire pumps, safe stabilization valves, fire pools.
3. Principles display: Show the working principle of the wet alarm system, the three -dimensional animation demonstration, the three -dimensional model is translucent, and the internal water flow can be seen. Equipped with exercise modules (4 built -in questions, there are prompts to choose correct and errors)
4. Design arrangement: There are choices and calculation questions, each question has scored scores. After submission, the correct answer and score are displayed
欢迎咨询Permanent magnet synchronous wind power grid system and comprehensive training device相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有Permanent magnet synchronous wind power grid system and comprehensive training device其他问题,可联系19957812178