Aerobic biological treatment training desk

Release Time : 2024-01-06  View Count :
Aerobic biological treatment tr--ning desk,Smart Home Tr--ning Device

1. Purpose of anaerobic experiment:
Aerobic biological treatment technology is not only used for organic sludge and high concentration organic wastewater, but also can treat low concentration sewage. Compared with aerobic biological treatment technology, anaerobic biological treatment has high organic load, low sludge yield, energy consumption, energy consumption A series of obvious advantages. A m--n structure of anaerobic biological treatment, which integrates anaerobic biological reactions and sedimentation, is separated, with high organic load and removal efficiency, and no mixing equipment is required. This model is a teaching experimental equipment for anaerobic reactor. Through the hope of this experiment, the following goals are achieved:
1. Understand the internal structure of anaerobic;
2. Master the method of starting the anaerobic, the formation of granular sludge;
3. Dynamic tests on a cert--n sewage to determine process parameters and process water quality.
Second, the purpose of membrane reaction experiments:
Film reactor sewage treatment device is a test device for integrated membrane biological reactors. The membrane bioreactor is a new sewage treatment process produced by the organic combination of membrane technology sewage biological treatment technology. Its production and development are the inevitable results of these two types of knowledge applications and development. Film technology and sewage biological treatment technology disciplines cross, combine, and open up new areas of sewage treatment technology research and application. Through the hope of this experiment, the following goals are achieved:
1. Understand the structure and working principle of membrane bioreactor;
2. Master the design and operation of the membrane biological reactor;
3. Merring the effectiveness of the membrane biological reactor to handle various sewage;
4. Explore the method of preventing membrane pollution and the method of membrane cleaning.
3. M--n technical indicators and parameters:
1. Environmental temperature: 5 ℃ ~ 40 ℃
2. Processing flow: 5 ~ 10L/h,
3. Device shape size: 1300mm × 400mm × 500mm
4. Work power: AC220V ± 10%, 50Hz, single -phase three -line system, power 800W, safety protection: ground protection, leakage protection, overcurrent protection

Aerobic biological treatment tr*ning desk(图1)


Aerobic biological treatment tr--ning desk,Smart Home Tr--ning Device

1. Equipment overview
According to the development trend and characteristics of the intelligent construction industry, the tr--ning device of the building engineering smart home system is combined with the functions and applications of the intelligent technology of the building, and the work tasks of the 5A subsystem of the building. The comprehensive use and expansion of a variety of technologies such as comprehensive wiring and system integration have met the related majors of related majors such as the installation and operation of the building intelligent equipment of technicians and vocational colleges, building equipment installation, building equipment installation, automation control, computer network and communication system engineering engineering Systems and principle demonstrations, skills display, work task design and planning, tr--ning, process and results assessment, assessment, appr--sal, competition, engineering project design and graduation design, etc.; Wiring, wiring, programming, debugging, operation, m--ntenance and m--ntenance, etc.), design planning, communication, teamwork, efficiency awareness, and innovative thinking, while cultivating its rigorous work style and good professional literacy.
2. Technical indicators
(16) Power input: single -phase three -line (third party ground), AC220V ± 10%, 50/60Hz;
(17) Safety protection: grounding, leakage (action current ≤30mA), overvoltage, overload, short circuit;
(18) The power consumption of the whole machine: ≤300W;
Dimensions (wide × height × depth): 1060mm × 1900mm × 800mm (industrial aluminum profile bracket);
3. Tr--ning project
1) System installation, wiring, wiring, programming, commissioning, operation, m--ntenance and m--ntenance;
2) Setting, detection and exclusion of line f--lure;
3) Independent understanding, wiring and control of independent modules;
4) The lighting brightness is automatically adjusted and controlled on time on time, manual control, and scenario programming;
5) Automatic control of doors and windows in time, manual control;
6) Infrared forwarding hand/automatic control;
7) Electrical power supply is broken/automatic, on time and indirect control;
8) Information query and post operation;
9) Urgent call for help operation;
10) Wiring, settings, operations and exercises integrated by smart home systems;
11) Installation and wiring of bridges and brackets;
12) Installation of information sockets and rack equipment;
13) The production and test of crystal head and jump line;
14) RJ45 module and the pressure line and test of the wiring frame;
15) The connection and link test of the RJ45 jumper.