News


Large and small trucks anatomy model experimental device
Release Time : 2024-01-08 View Count : 次
Large and small trucks anatomy model experimental device,ABF process active biological filter experimental device
one. Product introduction

Large and small trucks anatomy model experimental device,ABF process active biological filter experimental device
one. Product introduction
This tr--ning system is based on the original automotive assembly (disassembled the carriage), the key parts of each system of the system, the section surface is applied to different colors, and the structure level is highlighted.
Applicable to the tr--ning needs of all types of institutions and tr--ning institutions for the structure theory and m--ntenance tr--ning of various systems of automobiles.
two. Structure and composition
Anatomical engines, transmissions, driving bridges, frame and driver room assembly (including various assembly of the system, internal and external accessories, etc.), motor, and operating instructions.
three. Features
1. The principles and structure display of each system of the car.
2. Specify motor driving engine, dynamically demonstrate power drive and drive system work process.
3. The body electrical system is working normally, and dynamically demonstrates the work conditions of the body's electrical appliance system.
4. Each total of the key parts of the anatomical dissection, coating different colors, highlight the structure level.
5. Keep the wheel device to facilitate mobile devices and complete performance.
6. Support for instructions and tr--ning guidance.
7. Machinery assembly and fitter assembly virtual simulation software: This software is developed based on Unity3D. It can select 6 -level image quality. It has the design and virtual disassembly of the reducer and shaft structure, the design and simulation of common mechanical institutions, institutional resource libraries, institutional resource libraries. Typical mechanical institutions (virtual disassembly of gasoline engines), software is an overall software, which cannot be separate resources.
A. Turbine design and virtual disassembly interface can be selected from turbine sn--l pole cone gear reducer, second -level pilot gear reducer, conical cylindrical gear reducer, coaxial cylindrical gear reducer, cone gear reducer, first -class cylindrical, first -class cylindrical, Gear reducer.

Large and small trucks anatomy model experimental device,ABF process active biological filter experimental device
1. Experimental principles and purposes:
ABF's process process, a tower filter is set before the usual activated sludge process. It can be connected in series or connect with the aeration tank, but it is m--nly connected in series. There are many active sludge attached to the surface of the tower filter filter material, so the material of the filter material uses a polypropylene ball, ø40 ~ ø50, the porosity rate between the balls, the natural ventilation, and the biofilm when the biological membrane falls off at the age The filter bed is not easy to block. In the project, the tower is generally 4-6m high. The design load rate of the tower is 3.2kg/m3 ・ d, and the removal rate is about 65 %. The effect of treatment in winter is poor, which is related to water temperature. The outflow of the tower is as high as 6 to 8 mg/L (20 ° C), and the hypoxic fluid requires a high oxygen rate. As the concentration of wastewater is different, it can reach about 30 to 300mg/L ・ H.
The filter here uses a blanket (can also be exposed). The tower is a strong oxygen. Therefore, ABF can be regarded as a composite active sludge method.
The time of the sewage flow filter is less than 1min, but due to the existence of the pendant water of the filter material sludge layer, the staying time of the sewage is actually much longer.
Through the "ABF process" experiment, I hope to achieve the following purpose:
1. Master the basic operation process of the active biological filter "ABF process";
2. Deepen the principle of understanding the experiment;
3. Understand the process and technical parameters of the experiment, and improve the theoretical and practical knowledge of students.
2. M--n technical indicators and parameters:
1. Environmental temperature: 5 ℃ ~ 40 ℃
2. Treatment of water: 10 ~ 20L/h
3. Chi Shenchi: HRT 1 ~ 1.5h
4. Mixed pool: HRT 3 ~ 4H
5. Aeseum: HRT 6 ~ 8H
6. Second Shenchi: HRT 2H
7, water inlet quality: CODCR 400 ~ 800mg/L out of water quality: CODCR 40 ~ 80mg/L
8. Water inlet quality: BOD5 200 ~ 400mg/l Disting water quality: BOD5 15 ~ 30mg/L
9. Water inlet suspension: SS 150 ~ 200mg/L.
10. PH value: 6.5 ~ 8.5
11. Device shape size: 2400mm × 500mm × 1700mm.,
12. Work power: AC220V ± 10%, 50Hz, single -phase three -line system, power 800W, safety protection: ground protection, leakage protection, overcurrent protection
欢迎咨询Large and small trucks anatomy model experimental device相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有Large and small trucks anatomy model experimental device其他问题,可联系19957812178