News

Lee Baker Bioswater Treatment Experimental Device

Release Time : 2024-01-10  View Count :
Lee Baker Bioswater Treatment Experimental Device,Geometric body surveying and mapping experimental device

1. Experimental principles and purposes:
The "stay Baker" aeration tank is used to treat the biochemical treatment of phenolic wastewater in the gas station, and most of the active sludge method is adopted. Under the action of aeration, due to the rise of the --r during aeration, the mixture flows vertically in the pool, and the potential energy of the mixture is also made due to the potential energy of water inlet, reflux sludge, and reflux mixture, and at the same time, the mixture is also made in horizontal direction in the horizontal direction. The central water collection pipe flows according to the spiral, so that the mixed fluid flows into the second sinking pool to precipitate.
The factory has performed a test. The test results show that the volatile phenol removal rate is generally 81 % to 93 %, the COD removal rate is generally 48 % to 62 %, and the BOD5 removal rate is generally 71 % to 90 %.
Through this experimental device, I hope to achieve the following purpose:
1. Master the basic operation process of "staying Beck" biological sewage treatment device;
2. Deepen the principle of understanding the experiment;
3. Understand the process and technical parameters of the experiment, and improve the theoretical and practical knowledge of students.
2. M--n technical indicators and parameters:
1. Environmental temperature: 5 ℃ ~ 40 ℃
2. Treatment of water: 10 ~ 20L/h
3. Vertical stream two sinking pools: stay time 1.5 ~ 2.5h
4. Water inlet quality: CODCR 400 ~ 800mg/L out of water: CODCR 40 ~ 80mg/L
5. Inlet water quality: BOD5 200 ~ 400mg/L Out of Water: BOD5 15 ~ 30mg/L
6, water inlet suspension: SS 150 ~ 200mg/L out of water: SS 18 ~ 30mg/L
7, pH value: 6.5 ~ 8.5
8. Device shape size: 2500mm × 550mm × 1600mm,
9. Work power: AC220V ± 10%, 50Hz, single -phase three -line system, power of 1500W, safety protection: ground protection, leakage protection, overcurrent protection

Lee Baker Bioswater Treatment Experimental Device(图1)


Lee Baker Bioswater Treatment Experimental Device,Geometric body surveying and mapping experimental device

1. Product characteristics
1. Project visualization: Taking typical aluminum geometry as the tr--ning object;
2. Systematic functional: look at the tr--ning mode of finding things, measurement, three -dimensional projection drawing, and three -dimensional drawing drawing;
3. The popularization of students: small, combined, portable tr--ning devices, a group of two or three people, so that as much as possible students get
Full tr--ning opportunities
4. Standardization of teaching: supporting and guidance books, teaching and learning are very convenient, and the teaching effect is significant;
5. Management convenience: Geometric body, measurement tools and guidance books are placed in a refined box, which is very convenient to manage.
2. Product parameters
"Geometric Body" measured drawing tr--ning portfolio device
Project parameter project parameters
The size 40 × 30 × 7cm weight 3 (kg)
Combined geometry
(35 pieces/set) Basic geometric body (6) Overlay geometric body (6)
Decrease geometry (8) Comprehensive geometry (6)
Cutting geometric body (4) Following geometry (5)
Types of measuring tool steel ruler, inside (outside) card type
Portable combination (detection parts, measurement tools, and guidance books are placed in a refined color comprehensive box)
Teaching materials 1. Tr--ning guidance and tr--ning report (including electronic drafts)

欢迎咨询Lee Baker Bioswater Treatment Experimental Device相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有Lee Baker Bioswater Treatment Experimental Device其他问题,可联系19957812178