News


Building water supply and drainage electricity and automation experimental device
Release Time : 2024-04-06 View Count : 次
Building water supply and dr--nage electricity and automation experimental device,Camp--gn and mapping experimental device
I. Overview

Building water supply and dr--nage electricity and automation experimental device,Camp--gn and mapping experimental device
I. Overview
The overall design of the water dr--nage object model is designed with aluminum profile framework and mesh plate. It is m--nly installed on the steel frame base for dr--nage pipelines and has the characteristics of open type. , Sewage treatment system and control system six parts.
2. Functional characteristics:
1. St--nless steel water plate, cold and hot water faucet, simulate two -story building, mesh -type room, and 4 household water terminals
2. Pool: Made of st--nless steel, enter four roads all the way, provide constant water sources to each system, set up floating ball switches and exhaust holes to ensure the water level of the pool.
3. Three -phase water pump: two units, provide motivation for the constant pressure water supply system
4. Single -phase water pump: three units, providing power for the heating/heating system, the --r pressure supply system and the water pump water tank combined with the water pump water tank
5. Pressure transmitter: detect the current pressure value in the water pipe of the constant pressure water supply system, you can detect 0 ~ 400kPa pressure
6. Membership box pressure gauge: detect the current pressure value in the water pipe of the water supply system in the water supply system, you can detect 0 ~ 400kPa pressure
7. High -level water tank: water pump water tank water supply system water supply system, water pump water tank combined with water supply tr--ning with water sources to the user terminal, set up high and low water level switches to achieve automatic start and stop of water pumps
8. Pneumatic water tank: water pressure supply system water storage device, providing pressure water source to user terminal during the tr--ning of --r pressure supply system
9. High and low pressure switch: detect the current pressure of the water supply water supply system pipeline, provide signals for the start and stop of the pump
10. Pressure gauge: detect the current pressure of the pipeline of the --r pressure supply system, you can detect 0-1MPa pressure

Building water supply and dr--nage electricity and automation experimental device,Camp--gn and mapping experimental device
Function:
1. Institutional assembly tr--ning;
2. Measurement and tr--ning of institutional parts;
3. Drawing tr--ning tr--ning for institutions;
4. Drawing tr--ning for institutional parts;
Product parameters
1. Product material: aluminum alloy refined, use CNC machine tool refinement and produced through anode oxidation technology (do not accept rotation of rondrobin), each part must be installed in the aluminum alloy surveying box, and the buffer embedded material block;
2. In order to facilitate the safe surveying and mapping box size: about 365 × 265 × 120mm
3. Det--led configuration:
Cover of the frame, thread end cover, from the axis, camshaft.
Occupational skills comprehensive integration tr--ning virtual simulation system:
The software in the software can be rotated, magnified, reduced, and translated at 360 °. There are general interactive buttons: return, homepage, help. All virtual simulation tasks are prompted, and the software automatically hooks after a task. There is an experimental task above the tool library
1. Basic three -dimensional (XYZ space coordinate icon is automatically rotated at the XYZ space coordinate icon.)
A. Graphic stereo: The experimental steps are divided into experimental tasks (text prompt tasks) -the construction model (the model in the drag and dragging tool library to the three -projection surface system, and automatically appear the projection, there is a prompt when choosing an error) - change the attitude (by passing the passage) Click on the up, down, left and right arrows) — Select the projection (enter the answer interface, select the 3D projection map completed at this time in 6 items)
欢迎咨询Building water supply and drainage electricity and automation experimental device相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有Building water supply and drainage electricity and automation experimental device其他问题,可联系19957812178