News


Training Design Division of Turbine Medicine Members
Release Time : 2024-02-15 View Count : 次
Tr--ning Design Division of Turbine Medicine Members,Process control experimental device
Device function:

Tr--ning Design Division of Turbine Medicine Members,Process control experimental device
Device function:
1. Understand and master the structure and standard operating procedures of the turbine crusher.
2. Master the standard operating procedures, quality control points, and production management points of crushed posts.
3. Learn to clear the field correctly, clean the crushed equipment correctly, and correctly fill in actual operation skills such as crushing job production records.
Technical Parameters:
Subdivy Motent: 4000 rpm/min
Smash fineness: 10-120 mesh
Feed particle size: ≤5mm
Production capacity: Western medicine: 10-15kg/h, Chinese medicine: 8-12kg/h
Work power: 1.5KW
Shape size: 700 × 450 × 1500mm, a mobile design with a double brake wheel.

Tr--ning Design Division of Turbine Medicine Members,Process control experimental device
Note: PLC, inverter can be configured separately, or you can also use the PLC inverter speed adjustment tr--ning device to use
This experiment is configured with basic water tanks, pipelines, intelligent regulators, electromagnetic pumps, etc., using different industrial liquid levels to measure sensors to form a variety of liquid level detection systems. The sensors that can be provided include: str--n liquid levels, etc.
Master the accuracy analysis method by experimented with the familiar installation and testing methods, application characteristics, measurement scope, installation conditions, and grasp the accuracy analysis method.
This device has multiple security protection, providing IEC standard signals and related testing points for PLC access for programming experiments.
Device technical condition
1) Enter power supply: two -phase and three -line AC220V ± 10 % 50Hz;
2) Working environment: temperature -10 ℃- +40 ℃, relative humidity <85%(25 ℃) altitude <4000m;
3) Installation capacity: <0.5kva;
4) Dimensions: 400*600*700 unit mm.
欢迎咨询Training Design Division of Turbine Medicine Members相关问题,我们是源头工厂,有标准工业厂房生产基地,欢迎前来考察,如有Training Design Division of Turbine Medicine Members其他问题,可联系19957812178